NETWORK + LOW-VOLTAGE SUPPLY · WIGGINS, MISSISSIPPI

Prepared material packs

Less sorting. Fewer return trips.

A Wired Right kit converts a verified scope into counted, grouped and labeled materials for the place the work will actually happen.

01

Define the endpoint.

Equipment, connector, location, route, environment, distance and acceptance test.

02

Freeze the bill.

Exact SKUs, quantities, spares, delivered cost, terms and substitutions.

03

Stage the work.

Group by room, rack, counter or device; label parts and preserve the port plan.

04

Close the loop.

Record changes, unused material, installed identifiers and the agreed test evidence.

Parts-only path

Your team installs it.

GCT prepares the verified material pack and documentation. The installer remains responsible for field conditions, applicable code, permits and accepted workmanship.

Field-service path

GCT scopes the install too.

  • Cable-path and endpoint review
  • Material staging and labeling
  • Installation, termination or repair scope
  • Testing and as-built closeout
  • Required trade or permit gate identified in writing

A kit begins with the endpoint

Send the room list, rack sketch or equipment schedule.

Start a kit